HOUR  
  DAY  
  WEEK  
  Month  
     
   
     
  Setup  
  DOWNLOAD  
  Calculator  
 
 

MOBILE

 
    
 

3-Phase Power Monitor Recorder

Project Taiwan 台灣 UTC+8 MAC ID

DEMO_2

AD_7 0     V1 220 V        
AD_5 0     V2 220 V        
AD_4 0     V3 220 V        
AD_6     A AMP 0.00  A    L1 AMP 0.00 A
AD_3     B AMP 0.00  A    L2 AMP 0.00 A
AD_0     C AMP 0.00  A    L3 AMP 0.00 A
2024 / 8 / 25   NOW: 18 : 16 : 58 WTD:

9999

 

System Calibration Adjustment

 
V1 Vab Convert   AD7 Vab ( Default= 7.20 / AC220V )
 
V2 Vbc Convert   AD5 Vbc ( Default= 7.20 )
 
V3 Vac Convert   AD4 Vac ( Default= 7.20 )  
A Low AMP   AD6 CU6 ( Equa= 155 / 1- 25A )  AU6 Coef
B Low AMP   AD3 CU3  AU3
C Low AMP   AD0 CU0  AU0
A High AMP   AD6 CV6 ( Equa= 35 / 20- 100A )
  AV6 Coef
B High AMP   AD3 CV3
  AV3
C High AMP   AD0 CV0
  AV0
Zero Offset

 

Instruction

0

Host IP    Internet Host Server ( 3dok.biz )
CPU ID DEMO_2  
   

< Engineering Mode >

Causing: Factory data, Do not modify, There're unrecoverable setting !

100d= Data Low  All  /  110d= A Low   /  120d= B Low   /  130d= C Low  Locked.
200d= Data High All  /  210d= A High   /  220d= B High  /  230d= C High Locked.

 

   

     www.3dok.biz/pec

 (C) 2024  Primestar Energy